Operating data centers and power capacity
Company: Core Scientific
The claim, verbatim
Eight fully operational data centers located in Georgia (2), Kentucky (1), North Carolina (2), North Dakota (1), and Texas (2) with approximately 592MW of operating electric power as of December 31, 2022
Source (primary)
Core Scientific 10-K filed 2023-04-04 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “We currently have eight fully operational data centers in Georgia (2), Kentucky (1), North Carolina (2), North Dakota (1) and Texas (2), with approximately 592MW of operating electric power as of December 31, 2022”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states the eight data-center locations and 592MW capacity as of December 31, 2022 verbatim.
Confirmed in the source:
- Eight fully operational data centers in Georgia (2), Kentucky (1), North Carolina (2), North Dakota (1) and Texas (2)
- Approximately 592MW of operating electric power as of December 31, 2022
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1839341/000162828023010454/core-20221231.htm) in full (860,799 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Core Scientific 10-K filed 2023-04-04
Quote: “We currently have eight fully operational data centers in Georgia (2), Kentucky (1), North Carolina (2), North Dakota (1) and Texas (2), with approximately 592MW of operating electric power as of December 31, 2022”