King Mountain joint venture mining capacity
Company: Hut 8 - Project: King Mountain
The claim, verbatim
1.7 exahashes per second installed self-mining capacity at King Mountain, Texas site
Source (primary)
Hut 8 S-4/A filed 2023-04-18 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “The 1.7 EH/s installed self-mining capacity at the King Mountain, Texas site is owned by the joint venture (the " King Mountain JV ") in which USBTC has a 50% membership interest”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states the King Mountain, Texas site has 1.7 EH/s installed self-mining capacity.
Confirmed in the source:
- 1.7 EH/s installed self-mining capacity at the King Mountain, Texas site
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1964789/000110465923046342/tm235928-4_s4.htm) in full (1,280,835 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Hut 8 S-4/A filed 2023-04-18
Quote: “The 1.7 EH/s installed self-mining capacity at the King Mountain, Texas site is owned by the joint venture (the " King Mountain JV ") in which USBTC has a 50% membership interest”
