HPC hosting capacity expansion to 200 MW
Company: Applied Digital
The claim, verbatim
Applied Digital has current plans to expand HPC hosting capacity up to 200 MW through buildouts at existing and future locations
Source (primary)
Applied Digital 424B5 filed 2023-06-26 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “We have current plans to expand our HPC hosting capacity up to 200 MW through buildouts at existing and future locations.”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states this plan verbatim.
Confirmed in the source:
- Applied Digital has current plans to expand HPC hosting capacity up to 200 MW through buildouts at existing and future locations
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000114487923000166/apld-preliminaryprospectus.htm) in full (176,255 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Applied Digital 424B5 filed 2023-06-26
Quote: “We have current plans to expand our HPC hosting capacity up to 200 MW through buildouts at existing and future locations.”