HPC hosting expansion plans

Company: Applied Digital

Subject kind
facility capacity
Statement date
2023-06-25
Promised amount
200.0 MW
Current status
stated

The claim, verbatim

Plans to expand HPC hosting capacity up to 200 MW through buildouts at existing and future locations

Source (primary)

Applied Digital 8-K filed 2023-06-26 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗

Quote: “We have current plans to expand our HPC hosting capacity up to 200 MW through buildouts at existing and future locations.”

How we checked this

Checked on October 11, 2026. The cited source supports every part of this claim.

The filing states the company's current plans to expand HPC hosting capacity up to 200 MW through buildouts at existing and future locations.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000114487923000163/apld-20230626.htm) in full (11,186 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms Applied Digital 8-K filed 2023-06-26

Quote: “We have current plans to expand our HPC hosting capacity up to 200 MW through buildouts at existing and future locations.”

View cached copy (2026-09-13)Live source ↗

confirms Applied Digital 424B5 filed 2023-06-26

Quote: “We have current plans to expand our HPC hosting capacity up to 200 MW through buildouts at existing and future locations”

View cached copy (2026-09-13)Live source ↗