HPC hosting expansion plans
Company: Applied Digital
The claim, verbatim
Plans to expand HPC hosting capacity up to 200 MW through buildouts at existing and future locations
Source (primary)
Applied Digital 8-K filed 2023-06-26 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “We have current plans to expand our HPC hosting capacity up to 200 MW through buildouts at existing and future locations.”
How we checked this
Checked on October 11, 2026. The cited source supports every part of this claim.
The filing states the company's current plans to expand HPC hosting capacity up to 200 MW through buildouts at existing and future locations.
Confirmed in the source:
- Applied Digital planned to expand its HPC hosting capacity up to 200 MW
- The expansion was planned through buildouts at existing and future locations
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000114487923000163/apld-20230626.htm) in full (11,186 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Applied Digital 8-K filed 2023-06-26
Quote: “We have current plans to expand our HPC hosting capacity up to 200 MW through buildouts at existing and future locations.”
confirms Applied Digital 424B5 filed 2023-06-26
Quote: “We have current plans to expand our HPC hosting capacity up to 200 MW through buildouts at existing and future locations”