Combined installed self-mining capacity across six operating sites
Company: Hut 8 - Project: Granbury
The claim, verbatim
New Hut is expected to benefit from a combined installed self-mining capacity of 7.5 exahashes per second (EH/s) and 253 megawatts (MW) of total energy currently available from six sites: Medicine Hat, Drumheller, Niagara Falls, Kearney, Granbury, and King Mountain.
Source (primary)
Hut 8 S-4/A filed 2023-07-17 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “New Hut is expected to benefit from a combined installed self-mining capacity of 7.5 exahashes per second ("EH/s") and 253 megawatts ("MW") of total energy currently available from six sites with current self-mining operations: Medicine Hat, Alberta; Drumheller, Alberta; Niagara Falls, New York; Kearney, Nebraska; Granbury, Texas; and King Mountain, Texas.”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states this verbatim, including all six named sites.
Confirmed in the source:
- New Hut is expected to benefit from a combined installed self-mining capacity of 7.5 EH/s and 253 MW of total energy
- The energy is available from six sites: Medicine Hat, Drumheller, Niagara Falls, Kearney, Granbury, and King Mountain
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1964789/000110465923081328/tm235928-13_s4a.htm) in full (1,364,734 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Hut 8 S-4/A filed 2023-07-17
Quote: “New Hut is expected to benefit from a combined installed self-mining capacity of 7.5 exahashes per second ("EH/s") and 253 megawatts ("MW") of total energy currently available from six sites with current self-mining operations: Medicine Hat, Alberta; Drumheller, Alberta; Niagara Falls, New York; Kearney, Nebraska; Granbury, Texas; and King Mountain, Texas.”