HPC hosting capacity expansion plans
Company: Applied Digital
The claim, verbatim
Plans to expand HPC hosting capacity up to 200 megawatts through build outs at existing and future locations
Source (primary)
Applied Digital 10-K filed 2023-08-02 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “We have current plans to expand our HPC hosting capacity up to 200 MW through build outs at existing and future locations.”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states this plan verbatim.
Confirmed in the source:
- plans to expand HPC hosting capacity up to 200 MW through build outs at existing and future locations
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000114487923000176/apld-20230531.htm) in full (291,995 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Applied Digital 10-K filed 2023-08-02
Quote: “We have current plans to expand our HPC hosting capacity up to 200 MW through build outs at existing and future locations.”