jain.com

King Mountain joint venture with NextEra Energy

Company: Hut 8 - Project: King Mountain

Subject kind
partnership
Statement date
2023-08-23
Current status
stated

The claim, verbatim

USBTC holds 50% membership interest in King Mountain JV alongside NextEra Energy, with the JV owning 1.7 EH/s installed self-mining capacity in Texas

Source (primary)

Hut 8 S-4/A filed 2023-08-24 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗

Quote: “The 1.7 EH/s installed self-mining capacity at the King Mountain, Texas site is owned by the joint venture (the "King Mountain JV") in which USBTC has a 50% membership interest alongside NextEra Energy, Inc. ("NextEra").”

How we checked this

Checked on September 21, 2026. The cited source supports every part of this claim.

The document establishes the 50% interest, NextEra as co-venturer, and the 1.7 EH/s figure.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1964789/000110465923094950/tm235928-21_s4a.htm) in full (1,238,196 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms Hut 8 S-4/A filed 2023-08-24

Quote: “The 1.7 EH/s installed self-mining capacity at the King Mountain, Texas site is owned by the joint venture (the "King Mountain JV") in which USBTC has a 50% membership interest alongside NextEra Energy, Inc. ("NextEra").”

View cached copy (2026-09-13)Live source ↗