Prince George data center operational start
Company: IREN - Project: Prince George
The claim, verbatim
Prince George site in British Columbia commenced operations in September 2022
Source (primary)
IREN 424B3 filed 2023-09-26 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “our Prince George site has been operating since September 2022”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document lists Prince George as a BC site operating since September 2022.
Confirmed in the source:
- Prince George site is located in British Columbia
- Prince George site has been operating since September 2022
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1878848/000114036123045184/ny20011266x1_424b3.htm) in full (245,327 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms IREN 424B3 filed 2023-09-26
Quote: “our Prince George site has been operating since September 2022”