Nautilus Facility developed through joint venture
Company: TeraWulf - Project: Nautilus
The claim, verbatim
Nautilus Cryptomine Facility has been developed and constructed through a joint venture
Source (primary)
TeraWulf 10-Q filed 2023-11-13 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “The Nautilus Cryptomine Facility, which has been developed and constructed through a joint venture (see Note 11)”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states Nautilus was developed and constructed through a joint venture.
Confirmed in the source:
- The Nautilus Cryptomine Facility was developed and constructed through a joint venture
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000108330123000054/wulf-20230930.htm) in full (276,863 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 10-Q filed 2023-11-13
Quote: “The Nautilus Cryptomine Facility, which has been developed and constructed through a joint venture (see Note 11)”
