Nautilus nuclear power contract

Company: TeraWulf - Project: Nautilus

Subject kind
partnership
Statement date
2024-03-07
Promised amount
2.0 cents per kWh
Current status
stated

The claim, verbatim

Nautilus Cryptomine Facility powered by 100% behind-the-meter zero-carbon nuclear energy at fixed rate of 2.0 cents per kWh for 5-year term with two successive 3-year renewal options

Source (primary)

TeraWulf S-3/A filed 2024-03-08 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗

Quote: “Nautilus Cryptomine Facility represents the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy, which is contracted at a fixed rate of 2.0 cents per kilowatt-hour ("kWh") for a term of five years with two successive three-year renewal options.”

How we checked this

Checked on September 21, 2026. The cited source supports every part of this claim.

The document establishes the power source, rate, and contract term with renewal options.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000108330124000058/terawulfincs-3a3tobefiled.htm) in full (101,409 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms TeraWulf S-3/A filed 2024-03-08

Quote: “Nautilus Cryptomine Facility represents the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy, which is contracted at a fixed rate of 2.0 cents per kilowatt-hour ("kWh") for a term of five years with two successive three-year renewal options.”

View cached copy (2026-09-13)Live source ↗