jain.com

Nautilus nuclear power contract

Company: TeraWulf - Project: Nautilus

Subject kind
partnership
Statement date
2024-03-07
Promised amount
2.0 cents per kWh
Current status
stated

The claim, verbatim

Nautilus Cryptomine Facility powered by 100% behind-the-meter zero-carbon nuclear energy at fixed rate of 2.0 cents per kWh for 5-year term with two successive 3-year renewal options

Source (primary)

TeraWulf S-3/A filed 2024-03-08 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗

Quote: “Nautilus Cryptomine Facility represents the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy, which is contracted at a fixed rate of 2.0 cents per kilowatt-hour ("kWh") for a term of five years with two successive three-year renewal options.”

How we checked this

This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.

Additional evidence

confirms TeraWulf S-3/A filed 2024-03-08

Quote: “Nautilus Cryptomine Facility represents the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy, which is contracted at a fixed rate of 2.0 cents per kilowatt-hour ("kWh") for a term of five years with two successive three-year renewal options.”

View cached copy (2026-09-13)Live source ↗