Nautilus nuclear power contract
Company: TeraWulf - Project: Nautilus
The claim, verbatim
Nautilus Cryptomine Facility powered by 100% behind-the-meter zero-carbon nuclear energy at fixed rate of 2.0 cents per kWh for 5-year term with two successive 3-year renewal options
Source (primary)
TeraWulf S-3/A filed 2024-03-08 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “Nautilus Cryptomine Facility represents the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy, which is contracted at a fixed rate of 2.0 cents per kilowatt-hour ("kWh") for a term of five years with two successive three-year renewal options.”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms TeraWulf S-3/A filed 2024-03-08
Quote: “Nautilus Cryptomine Facility represents the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy, which is contracted at a fixed rate of 2.0 cents per kilowatt-hour ("kWh") for a term of five years with two successive three-year renewal options.”
