Lake Mariner current operating capacity
Company: TeraWulf - Project: Akela Data
The claim, verbatim
Lake Mariner Facility is operating approximately 110 MW of bitcoin mining capacity comprised of two approximately 50 MW buildings and approximately 10 MW on turbine deck of former coal plant
Source (primary)
TeraWulf S-3/A filed 2024-03-08 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “the Lake Mariner Facility is operating approximately 110 megawatt ("MW") of bitcoin mining capacity comprised of two approximately 50 MW buildings and approximately 10 MW located on the turbine deck of the former coal plant.”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states these Lake Mariner capacity figures and their composition verbatim.
Confirmed in the source:
- The Lake Mariner Facility is operating approximately 110 MW of bitcoin mining capacity
- The capacity comprises two approximately 50 MW buildings and approximately 10 MW located on the turbine deck of the former coal plant
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000108330124000058/terawulfincs-3a3tobefiled.htm) in full (101,409 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf S-3/A filed 2024-03-08
Quote: “the Lake Mariner Facility is operating approximately 110 megawatt ("MW") of bitcoin mining capacity comprised of two approximately 50 MW buildings and approximately 10 MW located on the turbine deck of the former coal plant.”