jain.com

Nautilus Cryptomine Facility total capacity

Company: TeraWulf - Project: Nautilus

Subject kind
facility capacity
Statement date
2024-03-21
Promised amount
200.0 MW
Current status
stated

The claim, verbatim

Nautilus facility in Berwick, Pennsylvania owns 200 MW bitcoin mining facility powered by nuclear energy from Susquehanna Station

Source (primary)

TeraWulf S-3/A filed 2024-03-22 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗

Quote: “Nautilus currently owns a 200 MW bitcoin mining facility located adjacent to the 2.5 gigawatt ("GW") nuclear-powered Susquehanna Station.”

How we checked this

Checked on September 21, 2026. The cited source supports every part of this claim.

The document confirms the Berwick location, 200 MW facility, and nuclear power from Susquehanna Station.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000108330124000079/terawulfincs-3a4tobefiled.htm) in full (100,343 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms TeraWulf S-3/A filed 2024-03-22

Quote: “Nautilus currently owns a 200 MW bitcoin mining facility located adjacent to the 2.5 gigawatt ("GW") nuclear-powered Susquehanna Station.”

View cached copy (2026-09-13)Live source ↗