Hunt 431 MW conditionally approved Batch Zero
Company: Core Scientific
The claim, verbatim
Hunt's planned 431 MW has been conditionally approved in Batch Zero as Base Load, Advancing Large Load, Pathway (e)
Source (primary)
Core Scientific 8-K filed 2026-09-10 (SEC EDGAR, sec_filing)
View cached copy (2026-09-11)Live source ↗
Quote: “The site's planned 431 Megawatts of electrical power has been conditionally approved in Batch Zero as "Base Load, Advancing Large Load, Pathway (e)"”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms Core Scientific 8-K filed 2026-09-10
Quote: “The site's planned 431 Megawatts of electrical power has been conditionally approved in Batch Zero as "Base Load, Advancing Large Load, Pathway (e)"”