Pecos 300 MW existing conditionally approved Batch Zero
Company: Core Scientific
The claim, verbatim
Pecos's existing 300 MW has been conditionally approved in Batch Zero as Base Load, Pathway (b)
Source (primary)
Core Scientific 8-K filed 2026-09-10 (SEC EDGAR, sec_filing)
View cached copy (2026-09-11)Live source ↗
Quote: “The existing 300 Megawatts of electrical power has been conditionally approved in Batch Zero as "Base Load, Pathway (b)"”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms Core Scientific 8-K filed 2026-09-10
Quote: “The existing 300 Megawatts of electrical power has been conditionally approved in Batch Zero as "Base Load, Pathway (b)"”