Pecos 300 MW existing conditionally approved Batch Zero

Company: Core Scientific

Subject kind
regulatory
Statement date
2026-09-09
Promised amount
300.0 MW
Current status
stated

The claim, verbatim

Pecos's existing 300 MW has been conditionally approved in Batch Zero as Base Load, Pathway (b)

Source (primary)

Core Scientific 8-K filed 2026-09-10 (SEC EDGAR, sec_filing)
View cached copy (2026-09-11)Live source ↗

Quote: “The existing 300 Megawatts of electrical power has been conditionally approved in Batch Zero as "Base Load, Pathway (b)"”

How we checked this

Checked on September 20, 2026. The cited source supports every part of this claim.

The document states Pecos's existing 300 MW was conditionally approved in Batch Zero as Base Load, Pathway (b).

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1839341/000183934126000023/core-20260910.htm) in full (5,482 characters, retrieved September 11, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms Core Scientific 8-K filed 2026-09-10

Quote: “The existing 300 Megawatts of electrical power has been conditionally approved in Batch Zero as "Base Load, Pathway (b)"”