Denton 74 MW validated in ERCOT 2025 RTP
Company: Core Scientific
The claim, verbatim
Denton's additional 74 MW was incorporated and validated in ERCOT's 2025 Regional Transmission Plan study cases
Source (primary)
Core Scientific 8-K filed 2026-09-10 (SEC EDGAR, sec_filing)
View cached copy (2026-09-11)Live source ↗
Quote: “The Site's additional 74 Megawatts of electrical power to be energized was previously incorporated in and validated by ERCOT's 2025 Regional Transmission Plan (RTP) study cases”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms Core Scientific 8-K filed 2026-09-10
Quote: “The Site's additional 74 Megawatts of electrical power to be energized was previously incorporated in and validated by ERCOT's 2025 Regional Transmission Plan (RTP) study cases”