McCamey
Project of Marathon Digital
Where it stands
Marathon's McCamey, TX site is a hosted facility at the King Mountain wind farm, originally hosted by a Compute North/NextEra joint venture; energization began in August 2022. The 2023 10-K shows the leased site at 216 MW with a host of Hut 8 and a lease running to August 2027. The FY2024 10-K (March 2025) lists McCamey with 216 MW operational capacity, no growth capacity and 7.6 EH/s energized; no newer passages exist, so the status as of late 2026 is unconfirmed.
216 MW in service
| Phase | MW | Status | Date | Source |
|---|---|---|---|---|
| McCamey hosted site | 216 | operational | 2025-03-02 | McCamey, Texas Colocated generation + grid 216 — 216 7.6 2025-03-02 View cached copy (2026-08-31)Live source ↗ |
Assessed November 1, 2026 from the newest filings, releases and reporting that name this project (newest relied on: March 2, 2025).
Claims about this project
Site intelligence
How we located this site
- Starting point (the project's stated locality) 2026-11-01
McCamey, TX → 31.13225, -102.22221 (locality) - No site-level evidence yet 2026-11-01
no address, road, landmark or coordinates tie this project to a specific parcel yet -- the town is shown, NOT the site - OpenStreetMap features nearby 2026-11-01
0 named match(es)
Satellite imagery on this page is drawn from the Google Earth satellite basemap. Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.