Norcross
Project of CleanSpark
Where it stands
CleanSpark bought the Norcross, GA property (5295 Brook Hollow Parkway, about 86,000-87,000 sq ft on about 7 acres) in August 2021 and converted it into its second bitcoin mining facility. The FY2023 10-K describes 20 MW of immersion-cooled capacity in two rooms, housing about 4,300 machines. The most recent filing (10-K filed November 2025) still places miners at the Norcross site, but no newer passage restates its MW, and the October 2026 articles only name the CSRE Properties Norcross subsidiary.
20 MW in service
| Phase | MW | Status | Date | Source |
|---|---|---|---|---|
| Norcross immersion facility (two rooms) | 20 | operational | There are two large rooms that house 20 MW of single-phase immersion—about 4,300 machines. 2023-11-30 View cached copy (2026-08-31)Live source ↗ |
Assessed November 1, 2026 from the newest filings, releases and reporting that name this project (newest relied on: November 24, 2025).
Claims about this project
Site intelligence
How we located this site
- Starting point (the project's stated locality) 2026-11-01
Norcross, Georgia → 33.94111, -84.21374 (locality) - No site-level evidence yet 2026-11-01
no address, road, landmark or coordinates tie this project to a specific parcel yet -- the town is shown, NOT the site - OpenStreetMap features nearby 2026-11-01
0 named match(es)
Satellite imagery on this page is drawn from the Google Earth satellite basemap. Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.