Contracted power capacity for deployment
Company: CoreWeave
The claim, verbatim
Total contracted power capacity of approximately 3.1 GW to be deployed over future periods
Source (primary)
CoreWeave 10-K filed 2026-03-02 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “our total contracted power capacity was approximately 3.1 GW, which we expect to deploy over future periods”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms CoreWeave 10-K filed 2026-03-02
Quote: “our total contracted power capacity was approximately 3.1 GW, which we expect to deploy over future periods”