Barber Lake total capacity
Company: Cipher Mining - Project: Barber Lake Facility
The claim, verbatim
Barber Lake Facility will have gross capacity of 300 MW, with 244 MW allocated to Fluidstack in Phase I and 56 MW in Phase II
Source (primary)
Cipher Mining 10-K filed 2026-02-24 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “The Barber Lake Facility is being constructed on 250 acres of land owned by Cipher Barber Lake, and will have a gross capacity of 300 MW. 244 MW of gross capacity will be allocated to Fluidstack in Barber Lake Phase I, and the remaining 56 MW will be allocated to Fluidstack in Barber Lake Phase II.”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms Cipher Mining 10-K filed 2026-02-24
Quote: “The Barber Lake Facility is being constructed on 250 acres of land owned by Cipher Barber Lake, and will have a gross capacity of 300 MW. 244 MW of gross capacity will be allocated to Fluidstack in Barber Lake Phase I, and the remaining 56 MW will be allocated to Fluidstack in Barber Lake Phase II.”