Contracted power capacity
Company: CleanSpark
The claim, verbatim
CleanSpark has 1.8 gigawatts of contracted power capacity
Source (primary)
CleanSpark Bitcoin Mining Boosts Output Amid Rising Hashprice - The Cryptonomist (-, news_article)
View cached copy (2026-09-09)Live source ↗Archive.org ↗
Quote: “808 megawatts of maximum concurrent power draw against 1.8 gigawatts of contracted capacity”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document reports 1.8 gigawatts of contracted capacity.
Confirmed in the source:
- CleanSpark has 1.8 gigawatts of contracted power capacity
What we did: Read our cached copy of the publisher (https://en.cryptonomist.ch/2026/09/09/cleanspark-bitcoin-mining-output/) in full (12,216 characters, retrieved September 9, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark Bitcoin Mining Boosts Output Amid Rising Hashprice - The Cryptonomist
Quote: “808 megawatts of maximum concurrent power draw against 1.8 gigawatts of contracted capacity”
