Studied load allocation in Texas

Company: CleanSpark

Subject kind
facility capacity
Statement date
2026-09-08
Promised amount
300.0 MW
Current status
stated

The claim, verbatim

Additional 300 MW studied load allocation in Texas alongside the baseload designation

Source (primary)

CleanSpark secures 585MW baseload for Batch Zero project amid ERCOT regulatory review - Crypto Briefing (-, news_article)
View cached copy (2026-09-09)Live source ↗Archive.org ↗

Quote: “with an additional 300 MW studied load allocation sitting alongside it”

How we checked this

Checked on September 20, 2026. The cited source supports every part of this claim.

The document states an additional 300 MW studied load allocation sits alongside the designation.

Confirmed in the source:

What we did: Read our cached copy of the publisher (https://cryptobriefing.com/cleanspark-585mw-batch-zero-ercot-baseload/) in full (9,596 characters, retrieved September 9, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms CleanSpark secures 585MW baseload for Batch Zero project amid ERCOT regulatory review - Crypto Briefing

Quote: “with an additional 300 MW studied load allocation sitting alongside it”

View cached copy (2026-09-09)Live source ↗Archive.org ↗