Studied load allocation in Texas
Company: CleanSpark
The claim, verbatim
Additional 300 MW studied load allocation in Texas alongside the baseload designation
Source (primary)
CleanSpark secures 585MW baseload for Batch Zero project amid ERCOT regulatory review - Crypto Briefing (-, news_article)
View cached copy (2026-09-09)Live source ↗Archive.org ↗
Quote: “with an additional 300 MW studied load allocation sitting alongside it”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document states an additional 300 MW studied load allocation sits alongside the designation.
Confirmed in the source:
- An additional 300 MW studied load allocation sits alongside the baseload designation in Texas
What we did: Read our cached copy of the publisher (https://cryptobriefing.com/cleanspark-585mw-batch-zero-ercot-baseload/) in full (9,596 characters, retrieved September 9, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark secures 585MW baseload for Batch Zero project amid ERCOT regulatory review - Crypto Briefing
Quote: “with an additional 300 MW studied load allocation sitting alongside it”
