ERCOT conditional approvals in Texas
Company: CleanSpark
The claim, verbatim
ERCOT issued conditional batch-zero classifications covering 585 MW of contracted baseload capacity and 300 MW of studied load capacity
Source (primary)
CleanSpark Bitcoin Mining Boosts Output Amid Rising Hashprice - The Cryptonomist (-, news_article)
View cached copy (2026-09-09)Live source ↗Archive.org ↗
Quote: “In Texas, the grid operator ERCOT issued conditional batch-zero classifications covering 585 MW of contracted baseload capacity and 300 MW of studied load capacity”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document states ERCOT issued conditional batch-zero classifications covering 585 MW of contracted baseload capacity and 300 MW of studied load capacity.
Confirmed in the source:
- ERCOT issued conditional batch-zero classifications covering 585 MW of contracted baseload capacity
- the classifications cover 300 MW of studied load capacity
What we did: Read our cached copy of the publisher (https://en.cryptonomist.ch/2026/09/09/cleanspark-bitcoin-mining-output/) in full (12,216 characters, retrieved September 9, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark Bitcoin Mining Boosts Output Amid Rising Hashprice - The Cryptonomist
Quote: “In Texas, the grid operator ERCOT issued conditional batch-zero classifications covering 585 MW of contracted baseload capacity and 300 MW of studied load capacity”
