Maximum concurrent power draw
Company: CleanSpark
The claim, verbatim
808 megawatts of maximum concurrent power draw
Source (primary)
CleanSpark Bitcoin Mining Boosts Output Amid Rising Hashprice - The Cryptonomist (-, news_article)
View cached copy (2026-09-09)Live source ↗Archive.org ↗
Quote: “808 megawatts of maximum concurrent power draw”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document states 808 MW of maximum concurrent power draw.
Confirmed in the source:
- CleanSpark reported 808 megawatts of maximum concurrent power draw
What we did: Read our cached copy of the publisher (https://en.cryptonomist.ch/2026/09/09/cleanspark-bitcoin-mining-output/) in full (12,216 characters, retrieved September 9, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark Bitcoin Mining Boosts Output Amid Rising Hashprice - The Cryptonomist
Quote: “808 megawatts of maximum concurrent power draw”
