jain.com

ERCOT conditional classification for Texas studied load capacity

Company: CleanSpark

Subject kind
regulatory
Statement date
2026-09-09
Promised amount
300.0 MW
Current status
stated

The claim, verbatim

ERCOT issued conditional batch-zero classification covering 300 MW of studied load capacity

Source (primary)

CleanSpark produces 593 BTC and sells 821 in August - Crypto News (-, news_article)
View cached copy (2026-09-09)Live source ↗Archive.org ↗

Quote: “ERCOT issued conditional batch-zero classifications covering 585 MW of contracted baseload capacity and 300 MW of studied load capacity”

How we checked this

Checked on September 20, 2026. The cited source supports every part of this claim.

The document states the classifications also covered 300 MW of studied load capacity.

Confirmed in the source:

What we did: Read our cached copy of the publisher (https://crypto.news/cleanspark-produces-593-btc-and-sells-821-in-august/) in full (14,780 characters, retrieved September 9, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms CleanSpark produces 593 BTC and sells 821 in August - Crypto News

Quote: “ERCOT issued conditional batch-zero classifications covering 585 MW of contracted baseload capacity and 300 MW of studied load capacity”

View cached copy (2026-09-09)Live source ↗Archive.org ↗