Sweetwater Hub ERCOT Base Load approval
Company: IREN
The claim, verbatim
Sweetwater Hub was conditionally included as Base Load in ERCOT Batch Zero process
Source (primary)
IREN Surges 7% on Conditional ERCOT Status for 2GW Sweetwater Hub, Applied Digital Climbs 6% - 24/7 Wall St. (-, news_article)
View cached copy (2026-09-09)Live source ↗Archive.org ↗
Quote: “its 2 GW Sweetwater Hub in Texas was conditionally included as Base Load in the Electric Reliability Council of Texas (ERCOT) Batch Zero process”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms IREN Surges 7% on Conditional ERCOT Status for 2GW Sweetwater Hub, Applied Digital Climbs 6% - 24/7 Wall St.
Quote: “its 2 GW Sweetwater Hub in Texas was conditionally included as Base Load in the Electric Reliability Council of Texas (ERCOT) Batch Zero process”
