Annual HPC critical IT capacity signings target
Company: TeraWulf
The claim, verbatim
TeraWulf is targeting 250 to 500 MW of annual HPC critical IT capacity signings from disciplined pipeline
Source (primary)
terawulf 8-K exhibit (terawulfq12026investorpr.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-08)Live source ↗
Quote: “Targeting 250–500 MW of annual HPC critical IT capacity signings”
How we checked this
Checked on September 19, 2026. The cited source supports every part of this claim.
Slide 4 states TeraWulf is targeting 250-500 MW of annual HPC critical IT capacity signings sourced from a disciplined pipeline of evaluated sites.
Confirmed in the source:
- TeraWulf is targeting 250 to 500 MW of annual HPC critical IT capacity signings
- The target draws from a disciplined pipeline of evaluated sites
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1083301/000108330126000083/terawulfq12026investorpr.htm) in full (27,664 characters, retrieved September 8, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms terawulf 8-K exhibit (terawulfq12026investorpr.htm)
Quote: “Targeting 250–500 MW of annual HPC critical IT capacity signings”