Childress 2027 expansion
Company: IREN
The claim, verbatim
400 megawatts of combined new liquid-cooled capacity and additional air-cooled retrofits at Childress in 2027, including 100 MW liquid-cooled (Horizons 5-6) and 250 MW air-cooled retrofits
Source (primary)
iren 8-K exhibit (irentranscript.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-07)Live source ↗
Quote: “With both new liquid-cooled capacity and additional air-cooled retrofits adding a total of 400 megawatts of gross capacity... 100 megawatts of additional liquid-cooled IT load for Horizons 5 and 6, as well as retrofitting an additional 250 megawatts of existing air-cooled capacity.”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (irentranscript.htm)
Quote: “With both new liquid-cooled capacity and additional air-cooled retrofits adding a total of 400 megawatts of gross capacity... 100 megawatts of additional liquid-cooled IT load for Horizons 5 and 6, as well as retrofitting an additional 250 megawatts of existing air-cooled capacity.”
