Childress 2027 expansion

Company: IREN

Subject kind
guidance
Statement date
2026-05-10
Promised by
2027-12-31
Promised amount
400.0 MW
Current status
stated

The claim, verbatim

400 megawatts of combined new liquid-cooled capacity and additional air-cooled retrofits at Childress in 2027, including 100 MW liquid-cooled (Horizons 5-6) and 250 MW air-cooled retrofits

Source (primary)

iren 8-K exhibit (irentranscript.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-07)Live source ↗

Quote: “With both new liquid-cooled capacity and additional air-cooled retrofits adding a total of 400 megawatts of gross capacity... 100 megawatts of additional liquid-cooled IT load for Horizons 5 and 6, as well as retrofitting an additional 250 megawatts of existing air-cooled capacity.”

How we checked this

Checked on September 19, 2026. The cited source supports every part of this claim.

The transcript establishes the 400 MW total, the 100 MW liquid-cooled for Horizons 5-6, and the 250 MW air-cooled retrofit at Childress for 2027, matching the claim's substance.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000187884826000028/irentranscript.htm) in full (50,400 characters, retrieved September 7, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms iren 8-K exhibit (irentranscript.htm)

Quote: “With both new liquid-cooled capacity and additional air-cooled retrofits adding a total of 400 megawatts of gross capacity... 100 megawatts of additional liquid-cooled IT load for Horizons 5 and 6, as well as retrofitting an additional 250 megawatts of existing air-cooled capacity.”

View cached copy (2026-09-07)Live source ↗