Beacon Point Utility Capacity
Company: Hut 8 - Project: Beacon Point
The claim, verbatim
Beacon Point has 1,000 MW of utility capacity secured under interconnection agreement with AEP Texas
Source (primary)
hut-8 8-K exhibit (tm2620835d1_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-03)Live source ↗
Quote: “its 1,000 MW of utility capacity, secured under an interconnection agreement with AEP Texas”
How we checked this
Checked on September 19, 2026. The cited source supports every part of this claim.
The document states the 1,000 MW of utility capacity is secured under an interconnection agreement with AEP Texas.
Confirmed in the source:
- Beacon Point has 1,000 MW of utility capacity
- The utility capacity is secured under an interconnection agreement with AEP Texas
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm) in full (13,326 characters, retrieved September 3, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms hut-8 8-K exhibit (tm2620835d1_ex99-1.htm)
Quote: “its 1,000 MW of utility capacity, secured under an interconnection agreement with AEP Texas”