Beacon Point Phase 2 IT Capacity
Company: Hut 8 - Project: Beacon Point
The claim, verbatim
Beacon Point Phase 2 will deliver 352 MW of IT capacity
Source (primary)
hut-8 8-K exhibit (tm2620835d1_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-03)Live source ↗
Quote: “second 352 MW AI factory designed to NVIDIA's DSX reference architecture”
How we checked this
Checked on September 19, 2026. The cited source supports every part of this claim.
The document describes a second 352 MW AI factory for Phase 2.
Confirmed in the source:
- Beacon Point Phase 2 will deliver 352 MW of IT capacity
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm) in full (13,326 characters, retrieved September 3, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms hut-8 8-K exhibit (tm2620835d1_ex99-1.htm)
Quote: “second 352 MW AI factory designed to NVIDIA's DSX reference architecture”
