jain.com

Beacon Point Phase 2 IT Capacity

Company: Hut 8 - Project: Beacon Point

Subject kind
facility capacity
Statement date
2026-07-19
Promised amount
352.0 MW
Current status
stated

The claim, verbatim

Beacon Point Phase 2 will deliver 352 MW of IT capacity

Source (primary)

hut-8 8-K exhibit (tm2620835d1_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-03)Live source ↗

Quote: “second 352 MW AI factory designed to NVIDIA's DSX reference architecture”

How we checked this

Checked on September 19, 2026. The cited source supports every part of this claim.

The document describes a second 352 MW AI factory for Phase 2.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm) in full (13,326 characters, retrieved September 3, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms hut-8 8-K exhibit (tm2620835d1_ex99-1.htm)

Quote: “second 352 MW AI factory designed to NVIDIA's DSX reference architecture”

View cached copy (2026-09-03)Live source ↗