Apollo site ERCOT interconnection study submission
Company: Cipher Mining
The claim, verbatim
Apollo site submitted as studied load in ERCOT Batch Zero through ERCOT's updated process
Source (primary)
cipher-mining 8-K exhibit (q226_earningsxprxdraftxvf.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-02)Live source ↗
Quote: “has been submitted as a studied load in Batch Zero through ERCOT's updated process”
How we checked this
Checked on September 19, 2026. The cited source supports every part of this claim.
The document states the Apollo site was submitted as a studied load in Batch Zero through ERCOT's updated process.
Confirmed in the source:
- The Apollo site has been submitted as a studied load in Batch Zero
- The submission was through ERCOT's updated process
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm) in full (18,358 characters, retrieved September 2, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms cipher-mining 8-K exhibit (q226_earningsxprxdraftxvf.htm)
Quote: “has been submitted as a studied load in Batch Zero through ERCOT's updated process”