Beacon Point Phase 2 expected annual NOI
Company: Hut 8 - Project: Beacon Point
The claim, verbatim
Beacon Point Phase 2 lease represents approximately $655 million of expected average annual NOI on triple-net, take-or-pay basis.
Source (primary)
hut-8 8-K exhibit (tm2621890d1_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-02)Live source ↗
Quote: “approximately $655.0 million of expected average annual NOI on a triple-net, take-or-pay basis”
How we checked this
Checked on September 19, 2026. The cited source supports every part of this claim.
The document states the second lease represents approximately $655.0 million of expected average annual NOI on a triple-net, take-or-pay basis.
Confirmed in the source:
- The second Beacon Point (Phase 2) lease represents approximately $655.0 million of expected average annual NOI
- The lease is on a triple-net, take-or-pay basis
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1964789/000110465926090041/tm2621890d1_ex99-1.htm) in full (23,702 characters, retrieved September 2, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms hut-8 8-K exhibit (tm2621890d1_ex99-1.htm)
Quote: “approximately $655.0 million of expected average annual NOI on a triple-net, take-or-pay basis”
