Energy Capacity Under Construction
Company: Hut 8
The claim, verbatim
Energy Capacity Under Construction rose to 1,330 MW after 500 MW at Beacon Point advanced, comprising 330 MW at River Bend and 1,000 MW at Beacon Point.
Source (primary)
hut-8 8-K exhibit (tm2628741d1_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-05)Live source ↗
Quote: “increasing total Energy Capacity Under Construction to 1,330 MW, comprising 330 MW at the River Bend campus and 1,000 MW at the Beacon Point campus”