2.0 MW AI/HPC pilot at Lake Mariner

Company: TeraWulf

Subject kind
facility capacity
Statement date
2024-06-03
Promised amount
2.0 MW
Current status
stated

The claim, verbatim

TeraWulf is building a 2.0 MW AI/HPC pilot at Lake Mariner with up to 8 nodes per rack, over 100 kW per rack, liquid cooling, and a design intended to meet SOC 2 standards.

Source (primary)

terawulf 8-K exhibit (wulfmay24opsreportdraft0.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-04)Live source ↗

Quote: “progress is underway at Lake Mariner on the previously announced construction of a 2.0 MW AI/HPC digital infrastructure pilot”

How we checked this

This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.

Additional evidence

confirms terawulf 8-K exhibit (wulfmay24opsreportdraft0.htm)

Quote: “progress is underway at Lake Mariner on the previously announced construction of a 2.0 MW AI/HPC digital infrastructure pilot”

View cached copy (2026-11-04)Live source ↗