510MW data center capacity in 2024
Company: IREN
What the later record shows
Delivered on time · happened December 31, 2024
The December 2024 monthly update shows 510MW total operating data center capacity, meeting the 2024 target.
“Childress (Texas, USA) 350 21.1 Complete Operating Total Operating 510 31”
2025-01-06 · iren 8-K exhibit (irendec2024monthlyupdate.htm) View cached copy (2026-10-21)Live source ↗
“Grid-Connected Power Secured 510MW Operating 1,800MW Under Construction / Power secured”
2025-02-05 · iren 8-K exhibit (janmonthlyupdatevff.htm) View cached copy (2026-10-20)Live source ↗
Checked November 4, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
IREN expects 510MW of operating data center capacity during 2024, up from 260MW currently operating.
Source (primary)
iren 8-K exhibit (ef20030723_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-04)Live source ↗
Quote: “260MW operating, 510MW in 2024”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (ef20030723_ex99-1.htm)
Quote: “260MW operating, 510MW in 2024”
confirms iren 8-K exhibit (janmonthlyupdatevff.htm)
Quote: “Grid-Connected Power Secured 510MW Operating 1,800MW Under Construction / Power secured”
confirms iren 8-K exhibit (irendec2024monthlyupdate.htm)
Quote: “Childress (Texas, USA) 350 21.1 Complete Operating Total Operating 510 31”