Texas Panhandle site 205 MW available power
Company: Hut 8
The claim, verbatim
Hut 8's new Texas Panhandle site has 205 MW of immediately available, low-cost, long-term power, capable of powering up to 205 MW of NVIDIA Blackwell GPUs or up to 16.5 exahash of next-generation ASICs.
Source (primary)
hut-8 8-K exhibit (hut-20240813xex99d1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-31)Live source ↗
Quote: “a new site in the Texas Panhandle with 205 megawatts of immediately available, low-cost, long-term power”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms hut-8 8-K exhibit (hut-20240813xex99d1.htm)
Quote: “a new site in the Texas Panhandle with 205 megawatts of immediately available, low-cost, long-term power”
