Echo facility behind-the-meter wind power
Company: Hut 8
The claim, verbatim
The Registration Statement stated the Echo facility at King Mountain is co-located behind the meter at a wind farm and can draw up to 100% of the wind project's output at peak, otherwise sourcing power from the ERCOT grid.
Source (primary)
Latino v. <mark>Hut 8 Corp</mark>. — Entry #9 (RECAP, court_filing)
View cached copy (2026-10-30)Live source ↗
Quote: “The Echo facility at King Mountain is co-located behind the meter at a wind farm, and at peak wind generation periods can draw up to 100% of the energy”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms Latino v. <mark>Hut 8 Corp</mark>. — Entry #9
Quote: “The Echo facility at King Mountain is co-located behind the meter at a wind farm, and at peak wind generation periods can draw up to 100% of the energy”
