Anthropic 401 MW 20-year lease
Company: TeraWulf - Project: Justified Data
The claim, verbatim
TeraWulf locked in a 20-year lease with Anthropic for approximately 401 MW at its repurposed smelter campus
Source (primary)
WULF Stock Rallies As AI Power Deals Stack Up - StocksToTrade (-, news_article)
View cached copy (2026-09-21)Live source ↗
Quote: “WULF locked in a 20‑year lease with Anthropic for roughly 401 MW at its repurposed smelter campus”
How we checked this
Checked on September 25, 2026. The cited source supports every part of this claim.
The article states that TeraWulf locked in a 20-year lease with Anthropic for roughly 401 MW at its repurposed smelter campus.
Confirmed in the source:
- TeraWulf entered a lease with Anthropic
- The lease term is 20 years
- The lease covers approximately 401 MW
- The lease is at TeraWulf's repurposed smelter campus
What we did: Read our cached copy of the publisher (https://stockstotrade.com/news/terawulf-inc-wulf-news-2026_09_18/) in full (12,809 characters, retrieved September 21, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms WULF Stock Rallies As AI Power Deals Stack Up - StocksToTrade
Quote: “WULF locked in a 20‑year lease with Anthropic for roughly 401 MW at its repurposed smelter campus”
