Sweetwater Hub included in ERCOT Batch Zero as Base Load
Company: IREN
The claim, verbatim
2GW Sweetwater Hub conditionally included in ERCOT Batch Zero as Base Load
Source (primary)
IREN’s 2GW Sweetwater Hub conditionally included in ERCOT Batch Zero - scanx.trade (-, news_article)
View cached copy (2026-09-14)Live source ↗
Quote: “IREN Limited (NASDAQ: IREN) announced that its 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load.”
How we checked this
Checked on September 23, 2026. The cited source supports every part of this claim.
The article reports the 2GW Sweetwater Hub was conditionally included in ERCOT Batch Zero as Base Load.
Confirmed in the source:
- IREN's Sweetwater Hub is 2GW
- The Sweetwater Hub was conditionally included in ERCOT Batch Zero
- The inclusion is as Base Load
What we did: Read our cached copy of the publisher (https://scanx.trade/stock-market-news/companies/irens-2gw-sweetwater-hub-conditionally-included-ercot-batch-zero/50411988) in full (17,649 characters, retrieved September 14, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms IREN’s 2GW Sweetwater Hub conditionally included in ERCOT Batch Zero - scanx.trade
Quote: “IREN Limited (NASDAQ: IREN) announced that its 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load.”
