ERCOT Batch Zero conditional inclusion
Company: IREN
The claim, verbatim
IREN's 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load.
Source (primary)
IREN’s 2GW Sweetwater Hub conditionally included in ERCOT Batch Zero - scanx.trade (-, news_article)
View cached copy (2026-09-14)Live source ↗
Quote: “IREN Limited (NASDAQ: IREN) announced that its 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load.”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms IREN’s 2GW Sweetwater Hub conditionally included in ERCOT Batch Zero - scanx.trade
Quote: “IREN Limited (NASDAQ: IREN) announced that its 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load.”
