ERCOT Batch Zero conditional inclusion
Company: IREN
The claim, verbatim
IREN's 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load.
Source (primary)
IREN’s 2GW Sweetwater Hub conditionally included in ERCOT Batch Zero - scanx.trade (-, news_article)
View cached copy (2026-09-14)Live source ↗
Quote: “IREN Limited (NASDAQ: IREN) announced that its 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load.”
How we checked this
Checked on October 11, 2026. The cited source supports every part of this claim.
The article states directly that IREN announced its 2GW Sweetwater Hub was conditionally included in ERCOT's Batch Zero process as Base Load. Every part of the claim appears in the source.
Confirmed in the source:
- IREN's Sweetwater Hub has a capacity of 2GW
- IREN's Sweetwater Hub has been conditionally included in ERCOT's Batch Zero process
- IREN's Sweetwater Hub was classified as Base Load in ERCOT's Batch Zero process
What we did: Read our cached copy of the publisher (https://scanx.trade/stock-market-news/companies/irens-2gw-sweetwater-hub-conditionally-included-ercot-batch-zero/50411988) in full (17,649 characters, retrieved September 14, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms IREN’s 2GW Sweetwater Hub conditionally included in ERCOT Batch Zero - scanx.trade
Quote: “IREN Limited (NASDAQ: IREN) announced that its 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load.”
confirms IREN shares stabilize as $1 billion ARR offsets AI slowdown fears - scanx.trade
Quote: “IREN Limited (NASDAQ: IREN) announced that its 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load”
