Exclusive manufacturing agreement with Pioneer Power for 18 months
Company: CleanSpark
What the later record shows
Outcome not yet confirmed
Later filings only restate the terms of the 18-month exclusive manufacturing agreement signed January 22, 2019. None says whether Pioneer actually manufactured for CleanSpark through the term.
“on January 22, 2019, CleanSpark and Pioneer Power entered into a Contract Manufacturing Agreement, whereby Pioneer Power shall exclusively manufacture parallel switchgears”
2019-12-15 · CleanSpark 10-K filed 2019-12-16 View cached copy (2026-09-13)Live source ↗
Checked October 9, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
Pioneer Power shall exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for CleanSpark for eighteen months from January 22, 2019.
Source (primary)
CleanSpark 10-Q filed 2020-02-10 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “We also signed a Contract Manufacturing Agreement, whereby Pioneer Power shall exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for us, for a period of eighteen months.”
How we checked this
Checked on October 11, 2026. The cited source supports part of this claim, but not all of it.
The filing describes the exclusive 18-month manufacturing agreement signed alongside the January 22, 2019 acquisition. It does not say when the 18-month period begins, so the January 22, 2019 start date is not established.
Confirmed in the source:
- CleanSpark signed a Contract Manufacturing Agreement with Pioneer Power in connection with its January 22, 2019 acquisition of Pioneer Critical Power, Inc.
- Under the agreement, Pioneer Power shall exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for CleanSpark
- The exclusive manufacturing period is eighteen months
We could not confirm this from the cited source:
- The eighteen-month manufacturing period runs from January 22, 2019
That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/827876/000166357720000033/clsk10q.htm) in full (113,627 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark 10-Q filed 2020-02-10
Quote: “We also signed a Contract Manufacturing Agreement, whereby Pioneer Power shall exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for us, for a period of eighteen months.”
