Exclusive contract manufacturing agreement with Pioneer Power
Company: CleanSpark
The claim, verbatim
Pioneer Power Solutions to exclusively manufacture parallel switchgears, automatic transfer switches, and related control and circuit protective equipment for CleanSpark for 18 months.
Source (primary)
CleanSpark 424B5 filed 2020-07-22 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “We also signed a Contract Manufacturing Agreement, whereby Pioneer Power shall exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for us, for a period of eighteen months.”
How we checked this
Checked on September 23, 2026. The cited source supports every part of this claim.
The document identifies Pioneer Power Solutions, Inc. as the counterparty and describes the exclusive 18-month manufacturing arrangement as claimed.
Confirmed in the source:
- CleanSpark signed a Contract Manufacturing Agreement with Pioneer Power Solutions, Inc.
- Pioneer Power is to exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for CleanSpark
- The exclusive arrangement runs for eighteen months
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/827876/000166357720000229/clsk_424b5.htm) in full (177,252 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark 424B5 filed 2020-07-22
Quote: “We also signed a Contract Manufacturing Agreement, whereby Pioneer Power shall exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for us, for a period of eighteen months.”
