jain.com

Exclusive contract manufacturing agreement with Pioneer Power

Company: CleanSpark

Subject kind
partnership
Statement date
2020-07-21
Current status
stated

The claim, verbatim

Pioneer Power Solutions to exclusively manufacture parallel switchgears, automatic transfer switches, and related control and circuit protective equipment for CleanSpark for 18 months.

Source (primary)

CleanSpark 424B5 filed 2020-07-22 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗

Quote: “We also signed a Contract Manufacturing Agreement, whereby Pioneer Power shall exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for us, for a period of eighteen months.”

How we checked this

Checked on September 23, 2026. The cited source supports every part of this claim.

The document identifies Pioneer Power Solutions, Inc. as the counterparty and describes the exclusive 18-month manufacturing arrangement as claimed.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/827876/000166357720000229/clsk_424b5.htm) in full (177,252 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms CleanSpark 424B5 filed 2020-07-22

Quote: “We also signed a Contract Manufacturing Agreement, whereby Pioneer Power shall exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for us, for a period of eighteen months.”

View cached copy (2026-09-13)Live source ↗