Exclusive manufacturing agreement with Pioneer Power Solutions
Company: CleanSpark
The claim, verbatim
Pioneer Power Solutions agreed to exclusively manufacture parallel switchgears, automatic transfer switches, and related control and circuit protective equipment for CleanSpark for a period of eighteen months.
Source (primary)
CleanSpark 424B5 filed 2020-10-06 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “We also signed a Contract Manufacturing Agreement, whereby Pioneer Power shall exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for us, for a period of eighteen months.”
How we checked this
Checked on September 23, 2026. The cited source supports every part of this claim.
The prospectus describes a Contract Manufacturing Agreement under which Pioneer Power exclusively manufactures the listed switchgear equipment for CleanSpark for eighteen months.
Confirmed in the source:
- CleanSpark signed a Contract Manufacturing Agreement with Pioneer Power Solutions
- Pioneer Power will exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for CleanSpark
- The exclusive manufacturing arrangement runs for eighteen months
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/827876/000166357720000361/clsk_424b5.htm) in full (174,643 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark 424B5 filed 2020-10-06
Quote: “We also signed a Contract Manufacturing Agreement, whereby Pioneer Power shall exclusively manufacture parallel switchgears, automatic transfer switches and related control and circuit protective equipment for us, for a period of eighteen months.”
