2022 miner deliveries guidance increase
Company: IREN
What the later record shows
Outcome not yet confirmed
No passage reports total miner deliveries for calendar 2022. The September 2022 20-F only says the last batch under the first two contracts was expected in October 2022.
“the last remaining batch of hardware under these contracts is expected to be shipped in October 2022”
2022-09-12 · IREN 20-F filed 2022-09-13 View cached copy (2026-09-13)Live source ↗
Checked October 9, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
Iris Energy increased its 2022 miner deliveries guidance from 4.3 EH/s to 6.0 EH/s
Source (primary)
IREN 6-K filed 2022-08-01 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “announcing an increase in 2022 miner deliveries from 4.3 EH/s to 6.0 EH/s”
How we checked this
Checked on October 11, 2026. The cited source supports every part of this claim.
The filing states that on August 1, 2022, Iris Energy issued a press release announcing an increase in 2022 miner deliveries from 4.3 EH/s to 6.0 EH/s. Calling this a guidance increase is a fair description of a mid-year announcement about full-year deliveries.
Confirmed in the source:
- Iris Energy Limited announced an increase in its 2022 miner deliveries
- The increase was from 4.3 EH/s to 6.0 EH/s
- The announcement was made via press release on August 1, 2022
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1878848/000114036122027558/brhc10040234_6k.htm) in full (1,530 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms IREN 6-K filed 2022-08-01
Quote: “announcing an increase in 2022 miner deliveries from 4.3 EH/s to 6.0 EH/s”