Bear Facility completion
Company: Cipher Mining - Project: Bear Facility
The claim, verbatim
Bear Facility 10 MW data center completed in October 2022
Source (primary)
Cipher Mining 10-K filed 2023-03-14 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “The Bear Facility is a 10 MW data center that is connected to the local electrical grid. It was completed in October 2022”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The 10-K states the Bear Facility is a 10 MW data center completed in October 2022.
Confirmed in the source:
- The Bear Facility is a 10 MW data center
- The Bear Facility was completed in October 2022
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1819989/000095017023007793/cifr-20221231.htm) in full (564,500 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Cipher Mining 10-K filed 2023-03-14
Quote: “The Bear Facility is a 10 MW data center that is connected to the local electrical grid. It was completed in October 2022”