jain.com

Odessa Facility full buildout target

Company: Cipher Mining

Subject kind
guidance
Statement date
2023-03-13
Promised amount
60000.0 units
Current status
stated

The claim, verbatim

When fully built at 207 MW, Odessa will operate 60,000 miners generating 6.2 EH/s

Source (primary)

Cipher Mining 10-K filed 2023-03-14 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗

Quote: “Once built out to the full 207MW of its electrical power capacity, we anticipate the Odessa Site will operate approximately 60,000 miners, capable of generating approximately 6.2 EH/s”

How we checked this

Checked on September 21, 2026. The cited source supports every part of this claim.

The full-buildout figures appear verbatim in the document.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1819989/000095017023007793/cifr-20221231.htm) in full (564,500 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms Cipher Mining 10-K filed 2023-03-14

Quote: “Once built out to the full 207MW of its electrical power capacity, we anticipate the Odessa Site will operate approximately 60,000 miners, capable of generating approximately 6.2 EH/s”

View cached copy (2026-09-13)Live source ↗