Electricity supply partnership with BC Hydro

Company: IREN

Subject kind
partnership
Statement date
2023-09-25
Current status
stated

The claim, verbatim

British Columbia data center sites connected to BC Hydro electricity transmission network and powered 100% by renewable energy since commencement of operations

Source (primary)

IREN 424B3 filed 2023-09-26 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗

Quote: “Each of our sites in British Columbia are connected to the British Columbia Hydro and Power Authority ("BC Hydro") electricity transmission network and have been 100% powered by renewable energy since commencement of operations”

How we checked this

Checked on September 21, 2026. The cited source supports every part of this claim.

The document states the BC sites are connected to the BC Hydro network and have been 100% powered by renewable energy since commencement.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1878848/000114036123045184/ny20011266x1_424b3.htm) in full (245,327 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms IREN 424B3 filed 2023-09-26

Quote: “Each of our sites in British Columbia are connected to the British Columbia Hydro and Power Authority ("BC Hydro") electricity transmission network and have been 100% powered by renewable energy since commencement of operations”

View cached copy (2026-09-13)Live source ↗