Target expansion of operating capacity to 9.4 EH/s
Company: IREN
The claim, verbatim
Iris Energy is targeting expansion in potential operating capacity to up to 9.4 EH/s, up from its previous target of 9.1 EH/s
Source (primary)
IREN 6-K filed 2023-10-06 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “The Company is now targeting expansion in potential operating capacity of up to 9.4 EH/s (previously 9.1 EH/s)”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states the company is now targeting up to 9.4 EH/s, previously 9.1 EH/s.
Confirmed in the source:
- Iris Energy is targeting potential operating capacity of up to 9.4 EH/s
- The previous target was 9.1 EH/s
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1878848/000114036123047243/ef20012126_6k.htm) in full (13,902 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms IREN 6-K filed 2023-10-06
Quote: “The Company is now targeting expansion in potential operating capacity of up to 9.4 EH/s (previously 9.1 EH/s)”
