Beacon Point Phase 2 utility capacity
Company: Hut 8 - Project: Beacon Point
The claim, verbatim
Phase 2 is supported by 500 MW of utility capacity
Source (primary)
AI Infrastructure Stock Hut 8 (TSX: HUT) Makes TSX Top Gainer List as Investors Continue Bet on Beacon Point Data Center - Investorideas.com (-, news_article)
View cached copy (2026-09-12)Live source ↗
Quote: “supported by 500 MW of utility capacity”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document states the second 352 MW AI factory is supported by 500 MW of utility capacity.
Confirmed in the source:
- Beacon Point Phase 2 is supported by 500 MW of utility capacity
What we did: Read our cached copy of the publisher (https://www.investorideas.com/news/2026/technology/09111-hut-8-tsx-top-gainer-beacon-point.asp) in full (10,868 characters, retrieved September 12, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms AI Infrastructure Stock Hut 8 (TSX: HUT) Makes TSX Top Gainer List as Investors Continue Bet on Beacon Point Data Center - Investorideas.com
Quote: “supported by 500 MW of utility capacity”