Texas studied load capacity - ERCOT classification
Company: CleanSpark
The claim, verbatim
ERCOT issued conditional classifications covering 300 MW of studied load capacity for CleanSpark's Texas sites
Source (primary)
CleanSpark produces 593 BTC and sells 821 in August - Cryptonews.net (-, news_article)
View cached copy (2026-09-10)Live source ↗Archive.org ↗
Quote: “300 MW of studied load capacity”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document lists 300 MW of studied load capacity within the ERCOT conditional classifications.
Confirmed in the source:
- ERCOT's conditional classifications covered 300 MW of studied load capacity for CleanSpark's Texas sites
What we did: Read our cached copy of the publisher (https://cryptonews.net/news/mining/33417160/) in full (9,164 characters, retrieved September 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark produces 593 BTC and sells 821 in August - Cryptonews.net
Quote: “300 MW of studied load capacity”
