ERCOT Batch Zero Conditional Inclusion
Company: IREN
The claim, verbatim
IREN's 2GW Sweetwater Hub was conditionally included in ERCOT Batch Zero as Base Load
Source (primary)
IREN shares stabilize as $1 billion ARR offsets AI slowdown fears - scanx.trade (-, news_article)
View cached copy (2026-09-20)Live source ↗
Quote: “IREN Limited (NASDAQ: IREN) announced that its 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load”
How we checked this
Checked on September 25, 2026. The cited source supports every part of this claim.
The document states IREN announced its 2GW Sweetwater Hub was conditionally included in ERCOT Batch Zero as Base Load.
Confirmed in the source:
- IREN's Sweetwater Hub is 2GW
- The Sweetwater Hub was conditionally included in ERCOT's Batch Zero process
- The classification is as Base Load
What we did: Read our cached copy of the publisher (https://scanx.trade/stock-market-news/companies/iren-shares-stabilize-1-billion-arr-offsets-ai-slowdown-fears/50942616) in full (19,501 characters, retrieved September 20, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms IREN shares stabilize as $1 billion ARR offsets AI slowdown fears - scanx.trade
Quote: “IREN Limited (NASDAQ: IREN) announced that its 2GW Sweetwater Hub has been conditionally included in the Electric Reliability Council of Texas (ERCOT) Batch Zero process as Base Load”
